Rapid Renovation

In this project, Eclipse was hired to transform an abandoned facility into a fully functional oil change operation in about 30 days.  The project included repairing significant termite damage, reconfiguring the lobby and office area, installation of new IT infrastructure, cabinetry, signage, and repainting the entire facility (inside and out).

Date: